2017 Road Reconstruction

Project Summary


The Work includes the reconstruction of approximately 3,600 linear feet of urban street and underground utilities including approximately 3,500 linear feet of cured in place pipe sanitary sewer lining, 2,000 linear feet of 4-inch sanitary sewer replacement, 15 manhole rehabilitations, approximately 4,000 linear feet of ductile iron water main replacement, 2,400 linear feet of copper water services, 1,800 linear feet of storm sewer, 3,600 linear feet of spot curb and gutter replacement, 8,500 tons of base course, and 4,000 tons of asphaltic concrete pavement.

Every project location will be receiving sanitary and water service laterals up to the property line and will be reconnected with residents private lines.


Project Contacts

Prime Contractor - Homburg Contractors Inc., Mike Hackel; Project Lead
Monona Public Works Project Manager - Brad Bruun
Consulting Engineer - Strand, Josh Straka; Project Manager


Project Schedule, 5/1-5/15


The contractor will begin to lay watermain along Tonyawatha Trl. from Progressive Ave to W. Dean Ave.  Watermain installation along W. Dean Ave. to Winnequah Rd. shall be complete by around the end of the week of 5/15.  As this is being completed, new water and sanitary laterals will begin to be installed along Progressive Ave.  These installations may be cause for removal of part of some residents curbside landscaping, mailboxes, or driveway aprons.  Any items that are in the path of the trench being dug for these laterals and are within City owned right-of-way will be removed in order to connect new laterals with existing laterals on resident's properties.

After installation of water and sanitary laterals, the contractor hopes to begin installing storm sewer along Phase 1 of the project.  After completion of installation of road bedding the contractor plans to come in and place a binder course down to provide a more sturdy driveable roadway until final paving can occur.


Public Please Obey Signage and Take Precautions

Local traffic only will be allowed in this work zone.  Bike and Vehicle detours will be set up to send travelers down Waterman Way or Midmoor Rd. if traveling South on Winnequah OR travelers will be directed down Nichols off Winnequah to McKenna or Midmoor Rd. if traveling North along Winnequah.

The contractor will be replacing water laterals and water main to begin the project and then will install new sanitary service laterals and storm sewer prior to lining sanitary sewer mains.  Temporary water and sanitary services will be shut off or residents may be asked to refrain from using these services as new connections are made.  Access to these work zones will be for local traffic only.  The contractor has assured the City that vehicle access will be granted to locals as much as possible.  At times during normal working hours a trench may be opened in front of a property and said homeowner may be asked to park their vehicle down the street a short distance until the work there can be finished and the driveway opened back up.

Finish pavement and concrete work will follow the completed utility work on each road segment.  

Road Reconstruction Documents

Bid Tab Summary
Traffic Control Plan
Project Plan Drawings

Contact Us

  1. City of Monona - City Hall
    5211 Schluter Rd.
    Monona, WI 53716
    (608) 222-2525

    City of Monona
    Public Works Project Coordinator
    & GIS Specialist


    Brad Bruun
    bbruun@ci.monona.wi.us
    (608)-222-2525 Ext. 7402